Question 1Choose one

A cloud service provider is migrating their default gateways from a legacy VRRP setup to Arista VARP to achieve true active-active forwarding across their MLAG leaf pairs. When configuring VARP on the Arista switches, which command is required globally to define the MAC address that all hosts will resolve for the gateway?

Question 2Choose one

An e-commerce company uses an Arista MLAG pair at the Top of Rack. Due to a hardware issue, Leaf-A reloads. When Leaf-A finishes booting, the MLAG peer-link establishes, but Leaf-A immediately suspends its orphan ports (single-attached servers) for a configured duration before bringing them online. What is the primary technical reason for this behavior?

Question 3Choose one

You are building a new L2LS fabric using the Arista EOS CLI. When configuring MLAG on the two spine switches, you must assign a specific identifier that allows the two switches to present themselves as a single logical switch to downstream devices. Which configuration parameter handles this requirement?

Question 4Choose one

A Managed Service Provider (MSP) uses CloudVision Portal (CVP) configlets to manage their L2LS deployments. A junior engineer bypassed CVP and made manual CLI changes to a Leaf switch to add a new VLAN. When you view the device in CVP, it shows as out of compliance. What is the correct CVP workflow to integrate this manual change into the CVP configuration baseline?

Question 5Choose one

At a university campus data center, an unauthorized user connects a small unmanaged switch to an access port on an Arista leaf switch and creates a loop. The port is configured with 'spanning-tree portfast' and 'spanning-tree bpduguard enable'. The port immediately transitions to an errdisable state. To ensure the port recovers automatically after 5 minutes once the rogue switch is removed, which global configuration command must be applied?

Question 6Choose one

A network architect is designing a new data center fabric that will eventually scale to over 200 leaf switches. They are deciding between OSPF and BGP for the underlay routing protocol. What is the primary technical justification for choosing BGP over OSPF in large-scale L3LS designs?

6 more free samples are waiting

Create a free account to unlock the whole ACE-L3-DCENG sample bank, or get full access to all 135 practice questions in the simulator.

Create account