Question 1Choose one

An engineer is adding a new expansion shelf to a production FlashArray//X. To maintain redundancy during the process, what is the correct cabling procedure for connecting the new shelf to the existing stack?

Question 2Choose 3

Which three pieces of information are required to be gathered from the customer's network team before an engineer can successfully complete the initial software configuration of a new FlashArray? (Select THREE)

Question 3Choose one

An engineer is onsite to perform a controller upgrade for a FlashArray//M series array. The site has very strict security protocols and the engineer is not permitted to connect their laptop to the management network. How can the engineer access the Purity CLI to perform the necessary pre-upgrade health checks?

Question 4Choose one

True or False: On a FlashArray//XR2 or //XR3 model, the built-in Ethernet ports designated for iSCSI traffic (eth2, eth3) can be reconfigured for management or replication traffic if they are not being used for iSCSI.

Question 5Choose one

An implementation specialist is reviewing a workplan for a capacity consolidation. The plan involves adding three new higher-capacity data packs to a FlashArray//X that currently has seven data packs installed. What is the minimum number of data packs required in a FlashArray//X chassis to maintain operation?

Question 6Choose one

After completing a Purity software upgrade, an engineer notices several new alerts related to 'unreclaimable space' on volumes that did not exist before the upgrade. The customer is concerned this indicates a problem. How should the engineer explain this situation?

Question 7Choose one

**Case Study:** A retail company has purchased a new FlashArray//X to replace an aging legacy SAN. The implementation specialist has been tasked with installing the array and ensuring all physical connections are redundant. The data center has two separate power distribution units (PDUs) fed from independent circuits, labeled A and B. The FlashArray chassis contains four power supply units (PSUs), numbered 0 through 3. The specialist needs to cable the PSUs to the rack PDUs to provide maximum fault tolerance against a single circuit or PDU failure. The following diagram illustrates the rear of the FlashArray chassis. graph TD subgraph FlashArray Chassis (Rear) PSU0 --- PSU1 PSU2 --- PSU3 end subgraph Rack PDUs PDU_A[PDU A] PDU_B[PDU B] end Which cabling scheme correctly implements power redundancy according to Pure Storage best practices?

Question 8Choose one

When verifying site readiness, an engineer learns that the only available rack for a new FlashArray installation is a 2-post (Telco) rack. What is the correct procedure in this situation?

Question 9Choose one

An engineer has just completed a controller upgrade on a FlashArray. As part of the post-upgrade verification, they need to confirm that all hardware components are healthy and recognized by the new controllers. Which Purity CLI command provides the most comprehensive hardware status overview?

Question 10Choose one

What is the primary purpose of the NV-RAM modules in a FlashArray controller?