Free CSPP sample questions
Real questions from the Certified Sustainable Project Professional (CSPP) practice bank, with the correct answer and an explanation for each one. No junk, no filler.
Try them in the simulator Same questions, with study, timed and flashcard modes.
Showing 6 of 12 free sample questions.
An electronic vehicle manufacturing project is choosing between two battery suppliers. Supplier A is cheaper and guarantees high performance (Prosperity) but has poor labor rights records in its mining operations (People). Supplier B uses fully certified ethical labor and has a lower carbon footprint (Planet) but costs 15% more, which reduces the immediate financial return of the project. Under the Triple Bottom Line (TBL) framework, how should the project team evaluate this trade-off?
True or False: The United Nations Global Compact consists of ten principles covering human rights, labor, environment, and anti-corruption, which businesses voluntarily commit to align their operations and strategies with.
A multinational project management office (PMO) is preparing its annual disclosures. The PMO needs to understand the distinct roles of the Global Reporting Initiative (GRI) and the Sustainability Accounting Standards Board (SASB) frameworks. Which statement accurately distinguishes between these two frameworks in a project context?
A project team is designing a coastal municipal park. The project charter specifies that the park must use native vegetation to absorb storm surges, actively restore the local degraded wetland ecosystem, and survive a Category 4 hurricane without requiring complete reconstruction. How do the concepts of sustainability, regeneration, and resilience map to these project goals?
### Background GreenTech Corp is initiating a major facility upgrade to transition from fossil-fuel-based heating to a geothermal and solar hybrid system. The project is being managed using the PRiSM (Project Integrating Sustainable Methods) life cycle approach. The project has completed its initial high-level feasibility assessments. ### Current Situation The project manager is now tasked with establishing the foundational sustainability baseline, identifying the key environmental and social risks, and defining the sustainable project management plan before the execution phase begins. The team must ensure that the transition does not disrupt existing plant operations or compromise worker safety. ### Requirements 1. Define the specific phase of the PRiSM life cycle the project is currently in. 2. Identify the primary PRiSM deliverable that must be created in this phase to guide all subsequent sustainability actions. 3. Establish how risks and opportunities should be evaluated at this stage. Which combination of PRiSM phase, primary deliverable, and risk management approach is correct for this scenario?
6 more free samples are waiting
Create a free account to unlock the whole CSPP sample bank, or get full access to all 150 practice questions in the simulator.