Question 1Choose one

A company implemented Demand Driven Material Requirements Planning (DDMRP). A crucial raw material has been identified as a strategic decoupling point. The consultant needs to configure the buffer that will drive replenishment signals for this item. Which DDMRP parameter directly defines the size of the safety stock portion of the buffer?

Question 2Choose one

A user reports that when they post a picking list journal for a production order, the raw material inventory is deducted. Later, when they post the report as finished journal, the same materials are deducted again, causing inventory levels to be incorrect. Which parameter in the Production control parameters is likely misconfigured, causing this double consumption?

Question 3Choose one

You are configuring a rebate agreement for a customer. The agreement states that the customer will receive a 2% rebate on all sales of a specific item group, but only after their cumulative purchases for that group exceed $50,000 within a calendar year. The rebate should be calculated on the entire amount once the threshold is met. What feature in Rebate management should be used to configure this cumulative threshold?

Question 4Choose one

An aerospace manufacturer must manage the lifecycle of its engineering products strictly. A new version of a product must go through 'Design', 'Prototype', and 'Testing' states. Only after successful testing and formal approval can it be moved to the 'Released' state, making it available for production planning and sales. Which Engineering Change Management feature is used to enforce these sequential states and control the product's usability at each stage?

Question 5Choose one

A meat packing company sells cuts of beef that are marked with a nominal weight but billed by the actual weight. This item is configured as a catch weight item. During the 'Report as finished' process for a production order, where must the user enter the actual weight of the finished product?

Question 6Choose one

You are creating a costing version for the upcoming fiscal year to update the standard costs of manufactured goods. After running BOM calculations, you need to ensure these new costs are used for all inventory transactions. What is the final step required to make the calculated costs in the costing version active?

Question 7Choose one

A chemical company must comply with regulations that restrict the sale of certain products to specific countries. They also need to print a Safety Data Sheet (SDS) automatically when shipping any order containing a hazardous item. Which feature should be used to manage these compliance rules?

Question 8Choose one

True or False: In a lean manufacturing environment, a production flow model must be approved and activated before it can be used in a kanban rule.

Question 9Choose one

A consultant is configuring the warehouse processes for production. When raw materials are needed for a production order, a warehouse worker must be directed to pick the items from bulk storage and move them to a specific staging location next to the production line. Which warehouse management feature is used to define this pick-and-put logic?

Question 10Choose one

A company manufactures a product that requires two operations, Assembly (Op 20) and Testing (Op 30), to run in parallel. After both are complete, a final Packaging operation (Op 40) begins. The process starts with a Kitting operation (Op 10). How should the `Next operation number` be configured on the route to model this parallel execution? flowchart TD A[Op 10: Kitting] --> B{Op 20: Assembly}; A --> C{Op 30: Testing}; B --> D[Op 40: Packaging]; C --> D;