ExamDumpster

Free MB-330 sample questions

Below are free MB-330 sample questions with answers and explanations. They cover products, warehouse work and landed cost. Work through them to see which supply chain topics need more study.

Try them in the simulator Same questions, with study, timed and flashcard modes.

Showing 10 of 20 free sample questions.

Question 1Choose one

You are configuring a new product that will be sold in boxes of 12 units. The inventory is tracked in individual units (eaches), but sales prices are defined per box. When a sales order is created for 1 box, the system must automatically convert this to 12 eaches for inventory reservation and picking, while ensuring the price is calculated for the box. Which configuration is needed for the unit of measure?

Question 2Choose one

A company is experiencing long master planning run times using the deprecated master planning engine. They are migrating to Planning Optimization. After the migration, they notice that planned purchase orders for long-lead-time items are being created much earlier than necessary. The planning logic appears to be ignoring the vendor's specified lead time. What is a likely cause for this issue in a Planning Optimization environment?

Question 3Choose one

A quality manager needs to implement a process where 10% of all received items from a specific vendor are automatically selected for quality inspection. If the inspection fails, all future receipts from that vendor for the next 30 days must be subject to 100% inspection. Which features should be combined to meet this requirement?

Question 4Choose 2

You are implementing transportation management for a client. The client has negotiated specific freight rates with a carrier that are based on the total weight of the shipment and the destination postal code. For example, shipments to postal code 90210 weighing between 1-100 kg cost $50, and 101-500 kg cost $125. Which components must be configured to model this rating structure? Select TWO that apply.

Question 5Choose one

A case study about a retail company, 'Urban Apparel', is presented. **Company Background:** Urban Apparel is a fast-fashion retailer with 50 stores and a central distribution center (DC). They use Dynamics 365 Supply Chain Management. Inventory is managed using WMS-enabled warehouses for both the DC and the stores. Each store is set up as a separate warehouse. **Current Situation:** To replenish stores, the DC currently uses transfer orders. Planners manually create transfer orders for each store based on sales reports, which is time-consuming and often inaccurate, leading to stockouts of popular items and overstocking of others. The company wants to automate this process based on the actual inventory levels at the stores. **Requirements:** The replenishment process must be automated. The system should automatically propose transfer orders from the DC to the stores when a store's inventory for an item drops below a defined minimum level. The proposed transfer order quantity should bring the stock level up to a specified maximum. The process must run nightly. **Question:** Which warehouse management process should be configured to meet Urban Apparel's store replenishment requirements?

Question 6Choose one

You need to configure a product filter code to group items for specialized handling during warehouse picking operations. Where do you associate a product filter code with a specific released product?

Question 7Choose one

A company is using the reservation hierarchy: Batch number -> License plate -> Location. They discover that for a specific high-demand item, sales clerks are reserving specific batch numbers far in advance, preventing the warehouse from using a FEFO (First-Expired, First-Out) picking strategy. You need to prevent sales clerks from being able to reserve against a specific batch, while still allowing warehouse workers to specify the batch during the picking process. What should you do?

Question 8Choose one

A company has a rebate agreement with a customer. The agreement states that the customer will receive a 2% rebate on all sales if their cumulative sales for the calendar year exceed $100,000. Rebates are calculated and paid quarterly. Which configuration on the rebate agreement header is required to support this?

Question 9Choose one

True or False: A bill of materials (BOM) can be configured with a 'Phantom' line type. When a production order is created for the parent item, the BOM component with the 'Phantom' line type will not be consumed from inventory, and its own sub-components will be exploded and consumed instead.

Question 10Choose one

A maintenance manager needs to schedule a recurring inspection for a fleet of forklifts. The inspection must occur every 200 hours of operation. A sensor on each forklift tracks its operational hours. How should this preventive maintenance be configured in the Asset Management module?

10 more free samples are waiting

Create a free account to unlock the whole MB-330 sample bank, or get full access to all 242 practice questions in the simulator.

Create account