Each free DES-1241 sample question below has the correct answer and an explanation. The set covers fault LEDs and alerts, part replacement and non-disruptive upgrades. Try a few to see how ready you are for hands-on PowerStore hardware work.

Try them in the simulator Same questions, with study, timed and flashcard modes.

Showing 10 of 20 free sample questions.

Question 1Choose one

**Case Study:** A mid-sized e-commerce company has purchased a PowerStore 5200T appliance. A junior platform engineer racked the base enclosure, connected power, and cabled ports 0 and 1 of each node's 4-port card (25GbE) to two top-of-rack switches. The switch ports are trunks that allow the iSCSI VLAN and the tagged management VLAN. No other cables were connected. Using a laptop on the node A service port, the engineer completed the Initial Configuration Wizard with the correct management VLAN ID and IP addresses. Afterwards, the cluster management IP address cannot be reached from the corporate network. What is the most likely cause?

Question 2Choose one

What is the primary purpose of following strict Electrostatic Discharge (ESD) handling procedures when replacing components like DIMMs or I/O modules in a PowerStore appliance?

Question 3Choose one

An engineer needs to collect a comprehensive support bundle from a PowerStore cluster that is experiencing intermittent performance degradation. The engineer wants to ensure the data collection includes detailed performance metrics from the last 24 hours. Which method should be used to initiate this data collection?

Question 4Choose one

What is a key difference between a Customer Replaceable Unit (CRU) and a Field Replaceable Unit (FRU) in the context of PowerStore maintenance?

Question 5Choose 3

A platform engineer is running the Initial Configuration Wizard on a new PowerStore 1000X appliance. Which three networks does the wizard configure? (Select THREE)

Question 6Choose one

While reviewing the hardware status of a PowerStore T appliance, an engineer notices that the base enclosure power and fault LED on the front of the enclosure is alternating between blue and amber. What does this LED state indicate?

Question 7Choose one

True or False: When adding a new expansion enclosure to a live, production PowerStore T cluster, a full cluster shutdown is required to safely cable and initialize the new hardware.

Question 8Choose one

An engineer is planning the physical installation of a PowerStore 7000X appliance. The data center has specific power requirements, and the engineer needs to find the maximum AC line current and power consumption for the appliance. Where is the most reliable place to find this official information?

Question 9Choose one

A platform engineer is designing the front-end cabling for a new PowerStore cluster that will serve both Fibre Channel and iSCSI hosts. To ensure maximum redundancy, what is the recommended best practice for connecting the appliance's ports to the network fabrics?

Question 10Choose one

**Case Study:** A retail company is experiencing issues with a newly installed PowerStore 1200T. The system was installed by a third-party contractor. The company's monitoring tools report intermittent connectivity loss to iSCSI volumes, especially during periods of high I/O. **Current Situation:** A senior platform engineer is called in to investigate. The engineer checks the PowerStore Manager and sees no hardware alerts. The front-end iSCSI network is configured on two 10GbE ports on each node, connected to redundant switches. The engineer inspects the switch configurations and finds that the ports connected to the PowerStore have an MTU size of 1500. **Problem:** The host servers and the PowerStore storage network are configured to use jumbo frames (MTU 9000) for better performance. The engineer suspects a network misconfiguration is causing the connectivity drops. The engineer's diagnostic process is outlined in the diagram below. Which step in the diagnostic process will confirm the root cause of the issue? flowchart TD A[Start: Intermittent iSCSI Drops] --> B{Check PowerStore Alerts}; B -->|No Alerts| C{Verify Physical Cabling}; C -->|Cabling OK| D{Check Switch Port Status}; D -->|Ports Up/Up| E{Review Switch Port MTU Config}; E --> F[Resolve Issue];