Free D-VXR-DY-23 sample questions
Real questions from the Dell VxRail Deploy 2023 practice bank, with the correct answer and an explanation for each one. No junk, no filler.
Try them in the simulator Same questions, with study, timed and flashcard modes.
Showing 8 of 17 free sample questions.
During the planning phase for a VxRail deployment, a consultant is verifying the Top-of-Rack (ToR) switch configuration. The environment will use a standard VxRail cluster with vSAN. Which multicast configuration on the physical switches is required for the cluster discovery and vSAN traffic?
A deployment engineer is preparing the JSON configuration file using the VxRail Configuration Portal. The customer requires the VxRail cluster to use an existing External vCenter Server. Which of the following IDs or names is strictly required to be accurate in the configuration file to ensure successful validation against the customer's environment?
You are physically installing a 4-node VxRail E660 series cluster. The site has dual Power Distribution Units (PDUs) in the rack: PDU A and PDU B. To ensure maximum power redundancy according to Dell best practices, how should the power supply units (PSUs) be cabled?
A deployment engineer attempts to initialize a new VxRail cluster but fails immediately during the network validation phase. The error log indicates 'Host name resolution failed'. Upon checking the Network Validation Tool (NVT) report, the forward records are correct. What is the most likely cause of this error?
You are deploying a VxRail cluster using the 'External vCenter' option. The customer provides a vCenter Server Appliance (VCSA) that manages three other clusters. Which specific permission requirement must be met for the VxRail management user account in this scenario?
After successfully deploying a VxRail cluster, you need to configure the vSAN Storage Policy to ensure data is protected against a double disk failure. The cluster consists of 6 nodes. Which RAID configuration should you apply in the storage policy?
A customer wants to expand an existing 4-node VxRail P-Series cluster running version 7.0.400. They have purchased a new P-Series node that shipped with version 8.0.000 factory installed. What is the correct procedure to add this node to the cluster?
9 more free samples are waiting
Create a free account to unlock the whole D-VXR-DY-23 sample bank, or get full access to all 215 practice questions in the simulator.