Free D-VXR-DY-02 sample questions
Real questions from the Dell VxRail Deploy (D-VXR-DY-02) practice bank, with the correct answer and an explanation for each one. No junk, no filler.
Try them in the simulator Same questions, with study, timed and flashcard modes.
Showing 6 of 12 free sample questions.
A customer requires their new VxRail cluster to be deployed using an existing, customer-managed vCenter Server. The implementation specialist is validating the prerequisites on the external vCenter. Which logical object must already exist in the customer-managed vCenter before initiating the VxRail first-run deployment?
A global enterprise is planning a Layer 3 (L3) VxRail deployment across multiple racks. The architect has mapped out the subnets for Management, vSAN, and vMotion. Reviewing the architecture, what is a mandatory requirement regarding the VxRail Manager and vCenter Server IP addressing in this topology? graph TD subgraph Rack 1 Node1[VxRail Node 1] Node2[VxRail Node 2] Node3[VxRail Node 3] end subgraph Rack 2 Node4[VxRail Node 4] Node5[VxRail Node 5] end Router[L3 Router] Node1 & Node2 & Node3 --> Router Node4 & Node5 --> Router
True or False: When preparing DNS for a new VxRail deployment, both Forward (A) and Reverse (PTR) records are strictly required for the ESXi hosts, VxRail Manager, and vCenter Server.
During the pre-deployment phase, an engineer is filling out the configuration parameters. Which TWO pieces of information must be provided specifically for the vSAN network? (Select TWO)
A deployment engineer runs the pre-install validation tool on a VxRail Manager before starting the build. The tool reports an error regarding MTU mismatch. What is the most common cause of this specific validation failure?
6 more free samples are waiting
Create a free account to unlock the whole D-VXR-DY-02 sample bank, or get full access to all 150 practice questions in the simulator.