ExamDumpster

Free D-VXR-DY-01 sample questions

Real questions from the Dell VxRail Deploy practice bank, with the correct answer and an explanation for each one. No junk, no filler.

Try them in the simulator Same questions, with study, timed and flashcard modes.

Showing 10 of 20 free sample questions.

Question 1Choose one

A deployment engineer is finalizing the network plan for a new 8-node VxRail P-Series cluster that will leverage vSAN Express Storage Architecture (ESA). The customer's top-of-rack switches are Dell S5248F-ON models. To maximize performance and ensure redundancy, which physical network cabling and VDS uplink configuration represents the best practice?

Question 2Choose 2

During the deployment of a VxRail cluster into a customer-managed vCenter, the process fails during the step where ESXi hosts are added to the vCenter inventory. The error message indicates 'Cannot contact the specified host. The host may not be available on the network'. A manual check confirms that the ESXi management IP addresses are pingable from the vCenter Server Appliance. Which of the following are the most likely causes of this issue? (Select TWO)

Question 3Choose one

A consultant has completed a VxRail deployment and is performing post-deployment validation. They run the vSAN Health Check and observe a warning under the 'Network' category related to 'All hosts have a vSAN vmknic configured'. Upon investigation, one of the four nodes in the cluster does not have a vmknic tagged for vSAN traffic. What is the most direct and appropriate method to resolve this issue?

Question 4Choose one

A DevOps team wants to automate the process of scaling out their VxRail clusters. They plan to use the VxRail REST API to add a new, pre-racked and cabled node to an existing cluster. What is the correct high-level sequence of API calls required to accomplish this?

Question 5Choose one

When using the VxRail Configuration Portal to plan a deployment, it is mandatory to generate a JSON configuration file that will be consumed by VxRail Manager during the initialization process.

Question 6Choose one

A technician is performing the initial hardware setup for a 4-node VxRail cluster. After racking and cabling the nodes, they need to configure the iDRAC for each node to enable discovery by VxRail Manager. The management network does not have a DHCP server. Which method should be used for the initial iDRAC configuration?

Question 7Choose one

An administrator is preparing the network environment for a new VxRail cluster. A requirement is to use Jumbo Frames (MTU 9000) for the vSAN network to improve performance. Which statement accurately describes where the MTU of 9000 must be configured for this to function correctly?

Question 8Choose one

A deployment engineer has successfully initialized a new 4-node VxRail cluster with a VxRail-managed vCenter. What is the first and most critical security-related task that should be performed as part of the post-deployment procedures?

Question 9Choose one

An administrator is planning to upgrade a VxRail 8.0.100 cluster to 8.0.210. Before starting the upgrade, they initiate the pre-upgrade health check from the VxRail Manager UI. The health check fails with an error related to insufficient vSAN capacity for data evacuation. What is the underlying reason for this failure?

Question 10Choose one

A VxRail administrator needs to collect a comprehensive log bundle to troubleshoot a performance issue for Dell Support. Which is the recommended method to gather all relevant logs from VxRail Manager, vCenter, ESXi hosts, and physical hardware components in a single, correlated package?

10 more free samples are waiting

Create a free account to unlock the whole D-VXR-DY-01 sample bank, or get full access to all 214 practice questions in the simulator.

Create account