Free D-PST-OE-23 sample questions
Get a feel for the exam with these free D-PST-OE-23 sample questions, each with the answer and an explanation. Host groups, snapshots and replication, and VMware storage all appear. Use them to check your daily PowerStore skills.
Try them in the simulator Same questions, with study, timed and flashcard modes.
Showing 10 of 20 free sample questions.
An administrator has configured a PowerStore NAS server for file sharing. After creating a new file system and an SMB share, Windows users report that they can connect to the share but cannot create or modify files. The administrator has verified that the users are members of the correct Active Directory group, and this group has been granted 'Full Control' on the SMB share permissions. What is the most likely remaining issue?
A new administrator is reviewing a PowerStore T series system and discovers several Volume Groups. What is the primary operational benefit of organizing volumes into a Volume Group?
A financial company wants to use a PowerStore file system for an archive solution that requires WORM (Write Once, Read Many) capabilities for compliance. The administrator needs to enable File-Level Retention (FLR). What is a mandatory prerequisite before FLR can be enabled on a file system?
After a regional power outage, an ESXi host in a stretched vSphere cluster loses connectivity to its local PowerStore array, which is part of a Metro Volume configuration. The VMs on that host automatically restart on other hosts at the surviving site. Which technologies are primarily responsible for this automated recovery? (Select TWO)
## Case Study A mid-sized e-commerce company, ShopFast Inc., is modernizing its data center. They have purchased a PowerStore 5200T array to replace their aging Dell EMC SC Series (Compellent) storage. The environment consists of a VMware vSphere cluster for their web and application servers, and a physical Microsoft SQL Server cluster for their primary database. Both environments currently use iSCSI for storage connectivity. The primary goals of the project are to migrate all workloads to the PowerStore with minimal downtime, improve data protection, and simplify management. The SQL Server database is spread across three LUNs (data, logs, tempdb) and requires application-consistent backups. The vSphere environment should be optimized for performance and granular VM management. **Requirements:** 1. Migrate the SQL Server and VMware workloads non-disruptively. 2. Implement a backup strategy that ensures the SQL database can be recovered to a consistent state. 3. Transition the VMware environment to leverage modern storage capabilities for better efficiency and control. 4. All management of the new environment should be as centralized as possible. Which solution best meets all of ShopFast's requirements?
An administrator is configuring NDMP backups for a PowerStore NAS server. The backup software is located on a separate network segment from the PowerStore's management interface. What must be configured on the PowerStore to allow the backup server (DMA) to communicate with the NAS server for backup operations?
A PowerStore administrator is troubleshooting a performance issue where an iSCSI-attached database server is experiencing high latency. The administrator has already ruled out issues on the host and the network. When viewing the volume's performance metrics in PowerStore Manager, which two metrics are most critical for diagnosing a storage-side bottleneck? (Select TWO)
True or False: When a PowerStore volume is restored from a snapshot, the original volume is overwritten, but any existing snapshots of that volume taken after the restore point are preserved.
A volume is replicated asynchronously to a remote PowerStore array. An administrator performs a 'Sync' operation on the replication session. What is the purpose of this action? sequenceDiagram participant Admin participant Source PowerStore participant Target PowerStore Admin->>Source PowerStore: Initiate 'Sync' Source PowerStore->>Target PowerStore: Transfer pending delta data Target PowerStore-->>Source PowerStore: Acknowledge sync completion Source PowerStore-->>Admin: Report session synchronized
10 more free samples are waiting
Create a free account to unlock the whole D-PST-OE-23 sample bank, or get full access to all 199 practice questions in the simulator.