Question 1Choose one

After an enterprise technician installs an uncertified third-party FPGA acceleration card into a PCIe slot on a PowerEdge server, all chassis fans immediately spin up to 100% duty cycle. The Lifecycle Controller log records event message PCI3018. Which RACADM command modifies the server thermal settings to disable this automatic fan boost for third-party PCIe cards?

Question 2Choose one

In a high-density datacenter environment with stringent thermal envelope limits, a systems administrator must cap the maximum air exhaust temperature of a PowerEdge server at 50°C. In the command racadm set system.thermalsettings.AirExhaustTemp _____, the correct parameter value that configures the 50°C limit is:

Question 3Choose one

A systems operations engineer is managing an isolated edge datacenter with 18 PowerEdge servers running iDRAC 10. Following an automated firmware update cycle to iDRAC 10 version 1.20.80.50, an edge application orchestration tool encounters recurring API authentication timeout issues. The decision is made to roll back the iDRAC firmware to the previously installed firmware build. The engineer connects to the iDRAC firmware RACADM prompt on the first server and executes: racadm rollback iDRAC.Embedded.1-1 The command fails immediately with a validation error indicating that the rollback cannot proceed in the current configuration. The engineer verifies that: - The engineer is logged in with an account having Configure privileges. - Running racadm swinventory confirms that Rollback Version is listed as Available for iDRAC.Embedded.1-1. - The job queue (racadm jobqueue view) contains no scheduled, running, or staged jobs. - The iDRAC NIC is currently configured to use Shared LOM mode across the server's embedded Ethernet interfaces. What action must the engineer perform before the iDRAC firmware rollback operation can succeed?

Question 4Choose one

An infrastructure team plans to standardize BIOS and component settings across 50 PowerEdge servers using Server Configuration Profiles (SCP). The team wants to validate attribute syntax and check for potential configuration errors on target servers without rebooting or applying any changes to the running system. Which feature and licensing condition satisfy this requirement?

Question 5Choose one

True or False: Applying an iDRAC firmware update using the RACADM CLI or the iDRAC web interface requires the embedded Lifecycle Controller to be in an enabled state, whereas executing the iDRAC Dell Update Package (DUP) directly within a supported host operating system does not require the Lifecycle Controller to be enabled.

Question 6Choose one

A PowerEdge server experiences an uncorrectable multi-bit memory error resulting in an automated system restart. An engineer needs to query the hardware-level BMC sensor events to identify the failing DIMM slot, rather than viewing the chronological record of administrative configuration changes. Which RACADM command should the engineer execute?