ExamDumpster

Free D-PSC-DS-01 sample questions

Test your PowerScale design thinking with these free D-PSC-DS-01 sample questions, each with the answer and an explanation. They cover requirements gathering, the OneFS Job Engine and SmartConnect. Use them to see which design topics need more study.

Try them in the simulator Same questions, with study, timed and flashcard modes.

Showing 6 of 12 free sample questions.

Question 1Choose one

A customer is designing their front-end network for a new PowerScale F900 cluster. They want to ensure that client connections are dynamically distributed based on the actual network throughput load of each node, rather than just round-robin DNS. Which feature and configuration are required to achieve this?

Question 2Choose one

A large enterprise wants to consolidate their disparate file servers onto a single PowerScale cluster. They have three distinct subsidiary companies (SubA, SubB, SubC). Each subsidiary uses its own Active Directory domain and completely overlapping IP address spaces (e.g., all three use 10.0.0.0/8 internally). How should you design the OneFS network configuration to support this requirement?

Question 3Choose one

An organization is deploying a 12-node PowerScale cluster for a mixed workload environment. They plan to use LACP (Link Aggregation Control Protocol) on the front-end network interfaces to provide redundancy and increased aggregate bandwidth. What is a critical design requirement when configuring LACP with OneFS?

Question 4Choose one

A company is designing a disaster recovery solution for their primary PowerScale cluster. The business requires an RPO (Recovery Point Objective) of 15 minutes. They want to ensure that if the primary site goes down, clients can be redirected to the DR site and continue working, with the ability to easily fail back once the primary site is restored. Which software feature must be included in the design?

Question 5Choose 3

Review the following customer requirements for a new PowerScale implementation: 1. Move data older than 1 year to an on-premises ECS object storage system to free up primary capacity. 2. Deduplicate home directory data to maximize storage efficiency. 3. Prevent marketing users from exceeding 5 TB of storage. Which combination of OneFS software features must you license and configure to meet ALL these requirements? (Select THREE)

Question 6Choose one

When designing a SmartConnect deployment for a workload heavily utilizing the SMBv3 protocol, which IP allocation method is considered the Dell best practice?

6 more free samples are waiting

Create a free account to unlock the whole D-PSC-DS-01 sample bank, or get full access to all 150 practice questions in the simulator.

Create account